Visit  QCAINSIGHTS.com
Logo
  • About Us
  • Services
  • Solutions
  • Industries
  • Projects
  • Careers
Contact Sales

Engineering Excellence in Every Automated Solution

  • Delta Head Office
    101-6951 72nd Street
    Delta, BC, V4G 0A2
  • Delta Office
    7351 Vantage Way, Unit 3
    Delta, BC, V4G 1C9
  • North Vancouver Office
    201-197 Forester Street
    North Vancouver, BC, V7H 0A6
Toll Free: 1-877-940-0868
sales@qcasystems.com
Connect With Us
QCA Systems LogoRockwell LogoRockwell Logo
Privacy Policy•Terms Of Use
QCA Systems © 2024 - Website by
SitePartners

First Narrows Pump Station Conveyance Project

Location: West Vancouver, BC

Contract Value: $1.5M

QCA Systems provided electrical engineering, automation, and integration solutions for the First Narrows Pump Station Conveyance Project, a 102 million liters per day pump station with a 1.2m influent pipe conveying sewage from Lionsgate to the new NS WWTP. Delivered under a design-build-finance model, the project was completed in 2022, on time and on budget.

Key contributions included:

  • Electrical engineering, control panel design, integration, and commissioning
  • Harmonic study and optimization of electrical systems
  • Full design-build-finance execution with seamless coordination

The project earned multiple accolades for its excellence, including the 2022 VRCA Awards of Excellence – Silver and the 2023 ACEC-BC Award of Merit for Municipal & Civil Infrastructure, showcasing QCA’s expertise in municipal water and wastewater infrastructure projects.

Previous ProjectNext Project